Subsea Cable Hang-Off Installation for Vietnam Offshore Wind

Cable Hang Off in Vietnamese


Location: Vietnam

Sector: Offshore Wind & Subsea Infrastructure

Product: Custom Subsea Cable Hang-Off System

Project Overview

As the global transition to renewable energy accelerates, Vietnam has become a pivotal market for offshore wind. Recently, a major Vietnamese contractor partnered with us for a critical phase of their offshore wind farm construction. The project required a high-performance Subsea Cable Hang-Off System to secure power cables to the turbine foundations, ensuring long-term stability in a high-corrosion marine environment.

Challenge: Complex Conditions & Strict Standards

The Vietnamese coastal waters present unique challenges, including volatile seabed geology and high humidity/salinity levels. The client had three core requirements:

Extreme Load Stability: The system had to withstand immense tension and bearing loads.

Corrosion Resistance: A guaranteed long-term lifespan in harsh saltwater conditions.

Site-Specific Adaptability: The hardware needed to integrate seamlessly with the existing foundation transition pieces.

Our Solution: A Tailored Engineering Approach

Our technical team moved beyond "off-the-shelf" products, providing a bespoke end-to-end solution:

Custom Design: We analyzed local climatic and geological data to optimize material selection and coating specifications, ensuring the hang-off bodies were resilient against local marine growth and corrosion.

Transparent Manufacturing: To build trust, we established a real-time communication channel. The client received regular photo updates, material test reports (MTRs), and factory acceptance test (FAT) data, providing total visibility from our workshop to their office.

Logistics & Customs Expertise: We utilized customized protective packaging to prevent transit damage and managed all cross-border customs documentation to ensure "Zero-Delay" delivery to the site.

The Result: "Worry-Free" Success

The installation was completed ahead of schedule. The client’s Project Manager noted:

"We chose this solution not just for the product performance, but for the professional service that made the entire process worry-free. Their rigor and responsibility make them a trusted partner for our future offshore wind expansions."

This successful deployment in Vietnam reinforces our position as a leader in Submarine Cable Protection Systems, proving that our combination of technical innovation and customer-centric service is the key to subsea excellence.

Partner with Us for Your Next Subsea Project

Whether you are facing complex sea conditions in Southeast Asia or need a customized anchoring solution elsewhere, we are ready to escort your project to success. Contact our engineering team today!